General Rules
>Each project team should submit a report before mid-way evaluation
>No team should be permitted to presention without a report duly verified by the corresponding guide
>A soft copy of the report and ppt should be present before the guide on 22/02/2010(Monday) or 23/02/2010(Tuesday) without fail
>document submission at last time is not permitted
>report may be of 30-50 pages and slides may be 25-35
>presentation time is 20-30 minutes,participate all members
>Report must contain
>Introduction
>System analysis-existng ,proposed system,specs.
>System design- use case ,sequence,DFD(latest level) ,
>Implementation -screen shots
>Project Progress - % of completion of each module & overall %
>Conclusion
>References - include refernces for analysis,design,implementation
>All other instructions will be given on due course
>Each project team should submit a report before mid-way evaluation
>No team should be permitted to presention without a report duly verified by the corresponding guide
>A soft copy of the report and ppt should be present before the guide on 22/02/2010(Monday) or 23/02/2010(Tuesday) without fail
>document submission at last time is not permitted
>report may be of 30-50 pages and slides may be 25-35
>presentation time is 20-30 minutes,participate all members
>Report must contain
>Introduction
>System analysis-existng ,proposed system,specs.
>System design- use case ,sequence,DFD(latest level) ,
>Implementation -screen shots
>Project Progress - % of completion of each module & overall %
>Conclusion
>References - include refernces for analysis,design,implementation
>All other instructions will be given on due course
For any doubts contact coordinator
Mid Way PPT
- Introduction
- System analysis(exiting and proposed,hardware specification(if there)and configuration)
- If u wish (Usecase,Sequence,ER)
- DFD level3 and any other important ones
- Implementation(language,screenshots)
- Completion(which all modules how much completed)
- Conclusion
Mid Way Report
- Introduction
- System analysis
- Design level 3 dfd
- Impletation,screenshots and progress
- Project completion
In the same format as given in the format of the one given by ilyas sir
for any doubt call ilyas sir
Hi download the project documents from the link given below
Click Here